• Use skylights in addition to embedded windows

    Use skylights in addition to embedded windows

    The use of skylights in addition to the windows that are considered at the height of the walls provide the light and brightness of the pool to a large extent during the day.
    Design and supervision of the pool of Isar Shahroud Cultural and Sports Complex
    For the convenience of some users who have a physical disability, the relevant issues and rules have been observed in its design. The coffee shop is one of them.
    @ ali.rahimian
    @sudabe_keikha
    @ hossein.bm64

    Use skylights in addition to embedded windows
    Use skylights in addition to embedded windows
    Use skylights in addition to embedded windows
  • Alternativ hotel Masiha project

    Alternativ hotel Masiha project

    Alternativ 2 Hotel masiha, in this option to provide a view of the main road in human proportions with the beach and create a communication passage across the land and finally the formation of separate lobbies for recreational, residential use and create a sense of invitation and create the maximum level in The facade has been noticed.
    Designing :
    @sudabe_keikha
    @elhammakinezhad
    Render:
    @ehsanakramii

    Alternativ hotel Masiha project
    Alternativ hotel Masiha project
  • Isar Shahroud Cultural and Sports Complex

    Isar Shahroud Cultural and Sports Complex

    Design and supervision of the pool of Isar Shahroud Cultural and Sports Complex
    Employer: General Office of the Martyr and Veterans Affairs Foundation of Semnan Province
    Facade and hardening completed
    Infrastructure: 2500 square meters
    Has a 25 by 13 pool bowl, hydrotherapy pool, sauna, Jacuzzi, gym and office
    Phase 10 and 2 design team:
    @sudabe_keikha
    @ motamedi.s
    @mollaei_saeeid
    @kasra_bozorgzadeh
    @nazaninshahbaazi
    Render:
    mohsenmaleki.arch
    Structural design team:
    @ arad.group.official
    Thanks to the monitoring partners:
    @hamed_moshfegh
    @ yousef.najafi.sanagou
    @ md.rahimian6335

    Isaar Shahroud

    07/14/2020 By smart dg land news arch
  • Hayat Tayebeh 48th grade school project in Urmia

    Hayat Tayebeh 48th grade school project in Urmia

    Project: Hayat Tayebeh 48th grade school in Urmia
    Infrastructure: 11500 square meters
    Employer: General Directorate of School Renovation of West Azerbaijan Province
    Supervision: Pai Khak Boom Consulting Engineers Company
    Viewed on 99.4.18

  • The project of 48-grade school in Tayyebeh yard, Urmia

    The project of 48-grade school in Tayyebeh yard, Urmia

    Visiting the supervisory managers of Tehran Central Office
    From the project of 48-grade school in Tayyebeh yard, Urmia
    Infrastructure: 11500 square meters
    Employer: General Directorate of School Renovation of West Azerbaijan Province
    Supervision: Pai Khak Boom Consulting Engineers Company
    The meeting to visit the workshop working on the Tayyeba Yard project was held due to the high prevalence of coronary heart disease in the open air.
    Mr. Rahimian, Managing Director, Mr. Moshfegh, Member of the Board, Ms. Niloufar Fathi, Managing Director of the Tehran Office, and Mr. Shahinfar, Head of the Supervision Department of West Azerbaijan Province, visited the Urmia Office on a monthly basis to review the issues and problems of the workshop.

  • Design of a 450 meter villa in Urmia

    Design of a 450 meter villa in Urmia

    Design of a 450 meter villa
    Orumieh
    Client: Engineer Masoumi
    1. Provide visual connection with the creation of a widow between classes
    2. Jacuzzi on the first floor terrace next to the master room
    3. The effect of greenhouse space on the stairway between the floors
    4. Providing different views around the building due to its location among the gardens around the city of Urmia
    Designing:
    @sudabe_keikha
    ahmahsamakinezhad
    Present:
    @soroush_qmc

1 2 3 4 5 24
Archives
Previous Next
Close
Test Caption
Test Description goes like this