Ways to Stop Meeting at Home
The above mentioned were all causes of the problem of sitting down and avoiding the points mentioned above but preventing a few other things will reduce the likelihood of this happening.
Reinforcing the home and increasing the earth’s bearing power by injecting compactors into the soil
Creating a gauze and base underneath the foundation (parts of the soil are removed and reinforcing reinforcement is placed vertically inside and filled with concrete).
Style building
Increase the number of columns in the building
Creating joints between building columns and shear walls
Tap the wall
Wall paneling or plaster and wall paint and crack removal and fracturing in various parts, which can be seen in both exterior and interior facades, are the consequences of building assembly. Of course, other factors, such as the penetration of moisture and high heat adjacent to the wall, are also involved.
To repair and rebuild the wall panels, the panels in the inner walls first remove the damaged parts. If the damage has progressed to the lower layers, they will be removed as well as the wall, if possible, soaked (brick soaking or other materials). They begin construction to prevent water absorption from the mortar, and then rebuild it with cement or gypsum mortar (depending on the material of the wall) to solve the problem of wall sheathing.
On the exterior of the building, the walls are usually made of stone, brick and tile, first with a hammer and a pen, carefully removing the wall and part of the wall and then repairing the siding with a mixture of sifted sand and cement to repair the wall. Fix the wall.
Conclusion
Building assembly usually occurs in the form of cracks on the inner walls and exterior, floor sliding or even bending of the building to one side.
Other signs of a building sit are the distance between the wall and the floor, the cracked circle around the nail, the flooring of the house, the crack on the basement wall, the twisting of doors and windows.
The negligence of executives and sometimes underemployment by the landlord due to economic issues in the early stages of construction (excavation, structural design, foundry, etc.) are the main reasons for building a meeting.
Imposing an extra burden on the building when completed (adding additional floors without the proper foundation) also results in a meeting in the building.
Earthquakes, non-circular construction in the surrounding areas of the building, and the deployment of vibrating machinery near the building are other contributors to the building meeting.
Wall tiling is another consequence of building congestion caused by pressure on the exterior of the walls. To solve the problem of drumming, they usually make mortars to solve the problem. Of course, the problem with wall mounting is related to the materials used.